- Econ Post
- Hot Products
- RapidLock - The New Swageless System
- Blinds & Awnings
- Catenary Lighting
- Fasteners
-
General Hardware
- Fasteners
- Fixing Plates
- Shackles
- Stainless Steel Chain
- Cleaning & Protection
- Hinges
- Eye Bolts
- Eye Nuts
- Cafe Blind Anchor Housing
- Blind and Awning
- Flush Ring Pulls
- Guy Wire Kit
- U Bolts
- Hooks & Snaps
- Links
- Lockwire
- Mame Blocks
- Pulley Blocks
- Rings
- Ropes
- Rigging Screw /Bottlescrew
- Screw Eyes
- Sheaves, Nylon Pulley Wheels
- Stayput Fittings
- Swage Sleeves & Wire Ferrules
- Swage Terminals
- Thimbles
- Threaded Rod
- Toggle Bolts
- Turnbuckles
- Wall Plates
- Wire Rope Grips
- Glass Balustrade
- Green Wall
- Marine
- Handrail
- Height Safety
- Kits
- Posts
- Shade Sail
- Tools
-
Wire Balustrade
- Architectural Ball
- Bevelled Washers
- Blind Nut Rivets/Nutserts
- Clean, Protect & Polish
- Eye Bolts
- Grommets
- Hex Head Tensioners
- Lag Screws
- Net Clip
- Balustrade Kits
- Rigging Screw/Bottlescrew
- Saddles/Eye Straps
- Screw Eyes
- Swage Sleeves/Ferrules
- Swage Terminals
- Stainless Steel Balustrade
- Thimbles
- Stainless Steel Wire Balustrade
- Threaded Forks
- Threaded Inserts
- Vertical Wire Balustrade
- Turnbuckles
-
Wire Balustrade Systems
- Blue Wave Swageless System For Metal Posts
- Blue Wave Swageless System For Timber Posts
- Econ Easy Angle System For Timber Posts - Stairs
- Econ Insert Swage Stud System For Timber Posts
- Econ Jaw Swage Bottlescrew System for Metal Posts
- Econ Jaw Swage Bottlescrew System for Timber Posts
- Econ Lag Screw Swage System
- Econ Lag Swage Bottlescrew System
- Econ Nutsert Swage Stud System For Metal Posts
- ProRig Insert Swage Stud System
- ProRig Insert Swage Stud System For Timber Stairs
- ProRig Insert Tension Rod System (requires a swaging tool)
- ProRig Jaw Swage Bottlescrew System for Metal Posts
- ProRig Jaw Swage Bottlescrew System for Timber Posts
- ProRig Jaw Swage Bottlescrew System with Flip Toggle
- ProRig Jaw Swage Bottlescrew System With Saddles - Metal Posts
- ProRig Jaw Swage Bottlescrew System With Saddles - Timber Posts
- ProRig Nutsert Swage Stud System
- ProRig Nutsert Swage Stud System - Stairs
- ProRig Nutsert Tension Rod System (requires a swaging tool)
- ProRig Quick Lock System
- Standard DIY System for Metal Posts
- Standard DIY System for Timber Posts
- Tensioner Swage Stud System
- Tensioner Swage Stud System with Flip Toggle
- Wire Rope
- New Arrivals
- Specials
Your shopping cart is empty!
Kit-DIY-Econ-1-Turnbuckle-HE-Timber
- Product Code: Kit-DIY-Econ-1-Turnbuckle-HE-Timber
- Availability: In Stock
OverView
DIY Turnbuckle Wire Balustrade Kit For Timber PostsDIY Turnbuckle Wire Balustrade Kit For Timber Posts
The Standard Turnbuckle DIY Wire Balustrade Kit suits straight and angled sections using timber posts and is a true do-it-yourself kit supplied with stainless steel fittings and wire rope for installation on-site. Although this system has a much more involved and time consuming installation process, it is ideal for those on a strict budget.
*** Suitable for sections under 10 metres **
Wire and tools need to be purchased separately, see above.
This kit includes:
2 x Econ Screw Eyes 6mm x 40mm
1 x Econ M5 Turnbuckle Hook/Eye
2 x 3.2mm Thimbles
2 x 3.2mm Swage Sleeves
Order 1 kit per wire run required. WIRE TO BE PURCHASED SEPARATELY OR VIA THE ACCESSORIES OPTIONS ABOVE
How To Install Balustrade System
1 - Mark out and pre-drill all posts with 4mm holes at the required spacing.
2- Insert screw eyes into all pre-drilled 4mm holes. Using a screw eye drive bit can cut down installation time.
3- Feed one of the thimbles onto the eye of the turnbuckle. (This may require some force).
4 - Feed one end of the wire onto a swage sleeve. Then continue this end of the wire through the thimble on the eye of the turnbuckle. Complete the loop by inserting the end of the wire back through the swage sleeve, leaving 2mm of protruding wire. Swage the swage sleeve two times spaced slightly apart using the HS-14CR tool on setting 3.
5 - Fix the hook end of the turnbuckle to the feed the other end of the wire rope through intermediate posts. At the termination post end, feed the remaining swage sleeve into the wire. Put the remaining thimble though the eye of the screw eye then feed the wire rope through the screw eye and around the thimble. Complete the loop by inserting the end of the wire back through the swage sleeve, leaving 2mm of protruding wire
6 - Tighten the tension of the wire by winding the turnbuckle.